Gantt Chart -Sandra Donohoe




The chart implies that at present the group is on target.

Having an initial design in place and calculations currently carried out to determine the stresses the crane would need to endure, along with materials and cost research taking place throughout in order to assess the design and improve where necessary.

Further work would however be required to ensure deadlines and milestones are met as it is important to ensure the team does not fall behind schedule.

An important aspect includes the marked milestones beginning the 29Th March (presentation and crane report tasks), as these could fall behind schedule should the crane concept not finish in the assigned week. An action plan would be immediately imposed to asses the situation and the appropriate course of action to be taken.